
This project replaces an aging irrigation diversion structure within the river channel to provide more reliable water delivery at the point of diversion. Work includes temporary water control, removal of the existing concrete diversion and water control gate, forebay sediment removal, and construction of a grouted boulder grade control structure, cast-in-place concrete headwall, and prefabricated water control gates. Traffic control, erosion and sediment controls, and site cleanup are also included.
Project Type
Irrigation Diversion Replacement/Rehabilitation
Pre-Bid Meeting Date
November 10, 2026 11:30 AM
Bid Due Date/Time
November 20, 2026 11:30 AM
Pre-Bid Meeting Location
At the Project Site at the entrance to the canyon leading to Taos Ski Valley at the intersection of NM-150 & NM-230, in Valdez, NM, 87580.
Bid Opening Location
Santa Fe Public Library Cafe Conference Room - 6599 Jaguar Dr, Santa Fe, NM 87507
NM Wage Rate Determination Number
TA-26-3731-H
Link to Bid Opening Video Conference
Click here to viewBidding Information and Instructions
Bidding Information and Instructions
Construction Drawings
Construction Drawings
Geotechnical Report
Construction Specifications
Plan Holders List
Plan Holders List
Bid Tabulation
Bid Tabulation
Addendum
Addendum
Addendum 2
Addendum 2
Addendum 3
Addendum 3